<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[RWE Gasstorage West Newsroom]]></title>
                    <link>https://news.rwe-gasstorage-west.com/</link>
                    <description></description>
                    <language>en</language>
                    <lastBuildDate>Tue, 08 Sep 2026 12:21:00 +0200</lastBuildDate>
                    <pubDate>Thu, 04 Dec 2025 14:25:04 +0100</pubDate>
                    <image>
                        <title><![CDATA[RWE Gasstorage West Newsroom]]></title>
                        <url>https://content.presspage.com/clients/150_1884.jpg</url>
                        <link>https://news.rwe-gasstorage-west.com/</link>
                        <width>144</width>
                    </image><item>
                        <title>GTC Consultation 2025</title>
                        <link>https://news.rwe-gasstorage-west.com/gtc-consultation-2025/</link>
                        <guid>https://news.rwe-gasstorage-west.com/gtc-consultation-2025/</guid><pp:caseid>730510</pp:caseid><description><![CDATA[<p style="margin-left:0px;text-align:left;">RWE Gas Storage West GmbH (as follows RGSW) consults all storage customers for its „General Terms and Conditions for access to the natural gas storage facilities operated by RGSW“ (GTC) according to § 28 para. 3 EnWG.&nbsp;</p><p style="margin-left:0px;text-align:left;">The consultation is based on the actual version attached in the <a href="https://www.rwe-gasstorage-west.com/en/download-area/" target="_blank">download area.</a> &nbsp;</p><p style="margin-left:0px;text-align:left;">All market parties are invited to send in their comments with regard to the GTC.</p><p style="margin-left:0px;text-align:left;">Please send us your comments in writing by 30st December&nbsp;2025.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Thu, 04 Dec 2025 14:25:04 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_825610-113.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_825610-113.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/825610-113.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[825610_113]]></pp:imageTitle></item><item>
                        <title>Storage Epe L-Gas will be switched to H-Gas</title>
                        <link>https://news.rwe-gasstorage-west.com/storage-epe-l-gas-will-be-switched-to-h-gas/</link>
                        <guid>https://news.rwe-gasstorage-west.com/storage-epe-l-gas-will-be-switched-to-h-gas/</guid><pp:caseid>728344</pp:caseid><description><![CDATA[<p><span>The natural gas storage Epe L-Gas of RWE Gas Storage West GmbH will be switched completely from L-Gas to H-Gas for storage usage as part of the German market area conversion on 01/04/2026. After completion of the technical work the storage will be usable as H-Gas storage in the market under the new name “Storage Epe DE” starting in April 2026.</span></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Wed, 12 Nov 2025 17:00:00 +0100</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1884.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/clients/150_1884.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1884.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>RWE Gas Storage West is starting to market the last available capacities in the Epe H2 hydrogen storage facility</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-gas-storage-west-is-starting-to-market-the-last-available-capacities-in-the-epe-h2-hydrogen-storage-facility/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-gas-storage-west-is-starting-to-market-the-last-available-capacities-in-the-epe-h2-hydrogen-storage-facility/</guid><pp:caseid>708521</pp:caseid><description><![CDATA[<p>RWE Gas Storage West GmbH (RGSW) is starting to market the last available storage capacities in the hydrogen storage facility currently under construction at the Gronau-Epe site. RGSW is launching a binding tender on 16 June. This is aimed at companies that wish to secure available storage capacity for hydrogen from 1 January 2028.</p><p>Construction work on Germany's first commercial hydrogen storage facility is already underway. RWE will fill the first cavern with hydrogen from mid-2026. At the same time, hydrogen will be used to pressurise the brine from a second cavern so that it can also be used for storage. Once completed, the storage facility with its two caverns will have an injection and withdrawal capacity of 50,000 cubic metres per hour and a working gas volume of around 38 million cubic metres. Around 70% of this has already been marketed. Commercial storage operations will start on 1 July 2027.</p><p>The current tender is for the 30% storage capacity that, for technical reasons, will not be available until 2028. In a market survey in spring 2025, RGSW asked potential customers about their requirements. The findings from this survey have been incorporated into the tender.</p><p>Transport and storage infrastructure will play a key role in the ramp-up of the hydrogen economy: storage facilities help to buffer the fluctuating hydrogen production from wind and solar power. This will enable hydrogen produced in the future to be made available to industrial customers as needed.</p><p>Further information and the tender documentation for the RWE Epe H2 hydrogen storage facility can be found at the following link:<br>&nbsp;</p><p><a href="https://www.rwe-gasstorage-west.com/en/hydrogen/marketing-of-h2-storage-capacities/" target="_blank">Marketing of remaining available capacities on our homepage.</a>&nbsp;<br>&nbsp;</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Mon, 16 Jun 2025 12:59:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/500_rwe-wasserstoff-3840x1660.jpg?78794" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/500_rwe-wasserstoff-3840x1660.jpg?78794</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/rwe-wasserstoff-3840x1660.jpg?78794</pp:imageOriginal><pp:imageTitle><![CDATA[RWE-Wasserstoff-3840x1660]]></pp:imageTitle><pp:imageDescription><![CDATA[Wasserstoff, Hydrogen, Grafik]]></pp:imageDescription></item><item>
                        <title>RGSW consults for the first time on the General Terms and Conditions for access to the hydrogen storage facilities operated by RGSW</title>
                        <link>https://news.rwe-gasstorage-west.com/rgsw-consults-for-the-first-time-on-the-general-terms-and-conditions-for-access-to-the-hydrogen-storage-facilities-operated-by-rgsw/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rgsw-consults-for-the-first-time-on-the-general-terms-and-conditions-for-access-to-the-hydrogen-storage-facilities-operated-by-rgsw/</guid><pp:caseid>703488</pp:caseid><description><![CDATA[<p>RWE Gas Storage West GmbH is planning the commercial commissioning of the first German hydrogen storage facility at the Gronau-Epe site for mid-2027 and is publishing for the first time the General Terms and Conditions for access to the hydrogen storage facilities operated by RGSW.</p><p><br>All market participants are invited to comment on the General Terms and Conditions.</p><p>The consultation is based on the version available in the <a href="https://www.rwe-gasstorage-west.com/en/hydrogen/marketing-of-h2-storage-capacities/" target="_blank">Consultation GTC hydrogen</a> storage section.</p><p><span>Please send us your written comments by <strong>23 May 2025</strong> at the latest.</span></p><p>&nbsp;</p><p><span>Following the consultation, we will review the feedback received and publish the final version of the GTC H<sub>2</sub>.</span></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Wed, 30 Apr 2025 15:43:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/500_rwe-wasserstoff-3840x1660.jpg?78794" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/500_rwe-wasserstoff-3840x1660.jpg?78794</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/rwe-wasserstoff-3840x1660.jpg?78794</pp:imageOriginal><pp:imageTitle><![CDATA[RWE-Wasserstoff-3840x1660]]></pp:imageTitle><pp:imageDescription><![CDATA[Wasserstoff, Hydrogen, Grafik]]></pp:imageDescription></item><item>
                        <title>RWE Gas Storage West launches market survey for its hydrogen storage capacities</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-gas-storage-west-launches-market-survey-for-its-hydrogen-storage-capacities/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-gas-storage-west-launches-market-survey-for-its-hydrogen-storage-capacities/</guid><pp:caseid>688717</pp:caseid><description><![CDATA[<p><span>RWE Gas Storage West GmbH is planning the commercial commissioning of the first German hydrogen storage facility at the Gronau-Epe site for 2027.&nbsp;</span><br><br><span>According to the current marketing status, 30% of the planned firm storage capacities are still available as of 1 January 2028. RWE Gas Storage West GmbH plans to market this remaining storage capacity in the first half of 2025.&nbsp;</span><br><br><span>In order to best align the marketing process and product design with customers needs, all market participants will have the opportunity from 24 February to specify their storage requirements and willingness to book. The survey will run until 28 March 2025 and can be accessed via the following </span><a href="https://www.rwe-gasstorage-west.com/marktabfrage-wasserstoff"><span>Link</span></a><span>.&nbsp;</span><br><br><span>The storage infrastructure will play a key role in the ramp-up of the hydrogen economy. Up to 38 million cubic metres (equivalent to approx. 135 gigawatt hours) of hydrogen can be stored in RWE's hydrogen cavern storage facility, which will help to buffer the fluctuating hydrogen production from wind and solar power. This will enable the hydrogen produced in the future to be made available to industrial customers aligned with their demand.&nbsp;</span></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Mon, 24 Feb 2025 08:54:47 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/500_rwe-wasserstoff-3840x1660.jpg?78794" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/500_rwe-wasserstoff-3840x1660.jpg?78794</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/9a757447-c6cc-4326-8fb9-f1f18c68af66/rwe-wasserstoff-3840x1660.jpg?78794</pp:imageOriginal><pp:imageTitle><![CDATA[RWE-Wasserstoff-3840x1660]]></pp:imageTitle><pp:imageDescription><![CDATA[Wasserstoff, Hydrogen, Grafik]]></pp:imageDescription></item><item>
                        <title>RGSW starts marketing activities Epe L-Gas for storage year 2025</title>
                        <link>https://news.rwe-gasstorage-west.com/rgsw-starts-marketing-activities-epe-l-gas-for-storage-year-2025/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rgsw-starts-marketing-activities-epe-l-gas-for-storage-year-2025/</guid><pp:caseid>681467</pp:caseid><description><![CDATA[<p><span>RWE Gas Storage West GmbH (RGSW) is starting the marketing activities for the natural gas storage facility Epe L-Gas for storage year 2025 from January 2025.&nbsp;</span></p><p><span>Market participants having a concrete interest in booking storage capacities in Epe L-Gas are invited to contact us until 24/01/2025. Our Sales Team is looking forward to hearing from you.</span></p><p>&nbsp;</p><p><span>Our storage Epe-Gas will be switched from L-Gas to H-Gas as part of the German market area conversion. In this regard, RGSW is currently in discussion with Open Grid Europe GmbH as adjacent grid operator and further relevant stakeholders.&nbsp;</span></p><p>&nbsp;</p><p><span>More information about the market area conversion you can find on the </span><a href="https://oge.net/en/natural-gas-biogas/natural-gas/network-operators/l-h-gas-conversion"><span>homepage of Open Grid Europe GmbH</span></a><span>.</span></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Mon, 16 Dec 2024 10:17:05 +0100</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1884.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/clients/150_1884.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1884.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>GTC Consultation 2024</title>
                        <link>https://news.rwe-gasstorage-west.com/gtc-consultation-2024/</link>
                        <guid>https://news.rwe-gasstorage-west.com/gtc-consultation-2024/</guid><pp:caseid>678580</pp:caseid><description><![CDATA[<p style="margin-left:0px;text-align:left;">RWE Gas Storage West GmbH (as follows RGSW) consults all storage customers for its „General Terms and Conditions for access to the natural gas storage facilities operated by RGSW“ (GTC) according to § 28 para. 3 EnWG.&nbsp;</p><p style="margin-left:0px;text-align:left;">The consultation is based on the actual version attached in the download area. &nbsp;</p><p style="margin-left:0px;text-align:left;">All market parties are invited to send in their comments with regard to the GTC.</p><p style="margin-left:0px;text-align:left;">Please send us your comments in writing by 30st December&nbsp;2024.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Sun, 01 Dec 2024 00:00:00 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_825610-113.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_825610-113.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/825610-113.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[825610_113]]></pp:imageTitle></item><item>
                        <title>New Gases Innovation Award: RWE Gas Storage West honoured in two categories</title>
                        <link>https://news.rwe-gasstorage-west.com/new-gases-innovation-award-rwe-gas-storage-west-honoured-in-two-categories/</link>
                        <guid>https://news.rwe-gasstorage-west.com/new-gases-innovation-award-rwe-gas-storage-west-honoured-in-two-categories/</guid><pp:caseid>678849</pp:caseid><description><![CDATA[<p>RWE Gas Storage West continues to drive the ramp-up of the European hydrogen market and is working on innovative hydrogen storage in underground salt caverns.</p><p>&nbsp;</p><p>The team has now received two prizes for this project at the <a href="https://innovationspreis-neue-gase.de/">New Gases Innovation Awards</a>.</p><p>&nbsp;</p><p>The project was nominated as one of three projects in the ‘Transport and Infrastructure’ category and ultimately won not only this category, but also the audience award. A favourite from all nine energy projects could be selected online. The RWE project received the most votes out of over 4,000 cast.</p><p>&nbsp;</p><p>The hydrogen storage plant &nbsp;in Gronau-Epe is currently under construction and is expected to go into commercial operation in 2027. Around 15 colleagues are working on the ‘H2-Storage &nbsp;Gronau-Epe’ project as part of the GetH2 initiative, which aims to realise the first commercial hydrogen storage facility in Germany.</p><p>&nbsp;</p><p>The public's choice and the number of votes show that the topic of hydrogen and the development of a suitable infrastructure are becoming increasingly relevant.</p><p>&nbsp;</p><p>The ‘H2-Storage Gronau-Epe’ team from RWE Gas Storage West would like to thank everyone who voted in favour of the project and thus showed an interest in this work.</p><p>The Federal Ministry of Education and Research is the patron of the award. The award ceremony took place on 13th of November in Berlin.</p><p>&nbsp;</p><p>All information about hydrogen storage by RWE can be found here:</p><p><a href="https://www.rwe-gasstorage-west.com/en/hydrogen/">https://www.rwe-gasstorage-west.com/en/hydrogen/</a></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Thu, 21 Nov 2024 09:49:29 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/virtual-rwe-background-h2.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Virtual_RWE_Background_H2]]></pp:imageTitle></item><item>
                        <title>RWE invites you to the Dialogue Market on October 8 in Gronau</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-invites-you-to-the-dialogue-market-on-october-8-in-gronau/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-invites-you-to-the-dialogue-market-on-october-8-in-gronau/</guid><pp:caseid>664787</pp:caseid><description><![CDATA[<p><strong>Plans for the expansion of its hydrogen storage facility will be presented.</strong><br><strong>All interested citizens are cordially invited to attend.</strong></p><p><br>RWE Gas Storage West will be presenting its plans for the expansion of its hydrogen cavern storage facility in Gronau at a public information event on October 8. All interested citizens and representatives of public bodies and the press are cordially invited to the dialog market:&nbsp;<br><br>RWE Dialogue Market on October 8, 2024&nbsp;<br><br>Location: “Alte Tenne”, Sunderhook 3, 48599 Gronau-Epe&nbsp;<br><br>Duration: 3 pm to 7 pm&nbsp;</p><p><br><br>At the information event, experts from RWE as well as from partners will be available for personal discussions and will present the project in detail.&nbsp;</p><p><br><br>Information on the project can also be found on the project homepage:&nbsp;<br><br><a href="https://www.rwe-gasstorage-west.com/en/hydrogen" target="_blank">https://www.rwe-gasstorage-west.com/en/hydrogen</a></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Mon, 07 Oct 2024 16:13:12 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/virtual-rwe-background-h2.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Virtual_RWE_Background_H2]]></pp:imageTitle></item><item>
                        <title>RWE expands plans for hydrogen storage facility in Gronau</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-expands-plans-for-hydrogen-storage-facility-in-gronau/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-expands-plans-for-hydrogen-storage-facility-in-gronau/</guid><pp:caseid>655192</pp:caseid><description><![CDATA[<p>RWE Gas Storage West is pushing ahead with the ramp-up of the European hydrogen market. To this end, it is expanding its plans to include additional underground and above-ground facilities for the storage of hydrogen at the Kottiger Hook site in the Gronau-Epe storage field.</p><p>Part of the framework operating plan procedure under mining law is a voluntary environmental impact assessment. This examines the potential impact of the project on the environment with the involvement of authorities, public agencies and the public. RWE submitted the necessary planning notification to the Arnsberg district government in July. Today, the authority has now announced the start of the so-called scoping procedure.</p><p>In Germany, the scoping procedure is required by law to ensure that environmental assessments are carried out effectively. It is used to define relevant topics and aspects that need to be considered as part of a project and to determine the scope and depth of the investigations.</p><p>We will also provide the public with transparent information about the expansion of the hydrogen storage facility currently under construction,’ emphasises André Tenbrock, Head of Operations at RWE Gas Storage West. As in the past, RWE will be holding several events to provide information about the project and its progress. The next public information event is already planned for September in the form of a dialogue market in Gronau-Epe; RWE will provide information on the time and place as soon as possible.</p><p>&nbsp;</p><p>The transport and storage infrastructure will play a key role in the ramp-up of the hydrogen economy. The hydrogen cavern storage facility planned by RWE Gas Storage West will help to buffer the fluctuating production of hydrogen from wind and solar power. This will enable green hydrogen to be made available to industrial consumers as and when required.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Fri, 16 Aug 2024 19:20:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/virtual-rwe-background-h2.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Virtual_RWE_Background_H2]]></pp:imageTitle></item><item>
                        <title>German and state governments grant funding for large hydrogen projects by RWE</title>
                        <link>https://news.rwe-gasstorage-west.com/german-and-state-governments-grant-funding-for-large-hydrogen-projects-by-rwe/</link>
                        <guid>https://news.rwe-gasstorage-west.com/german-and-state-governments-grant-funding-for-large-hydrogen-projects-by-rwe/</guid><pp:caseid>652144</pp:caseid><pp:summary><![CDATA[<ul><li><strong>Electrolyser plant in Lingen and hydrogen storage facility in Epe to be funded with a&nbsp;</strong><span><strong>total of 619 million euros</strong></span></li><li><strong>Rostock electrolysis project with RWE participation to receive 199 million euros</strong></li><li><strong>Funds to be provided by German government and states of Lower Saxony,&nbsp;</strong><span><strong>North Rhine-Westphalia, and Mecklenburg-Western Pomerania</strong></span></li></ul>]]></pp:summary><description><![CDATA[<p style="margin-left:0px;text-align:start;">Earlier today, the German government and federal state governments confirmed that funding of over 619 million euros has been granted to implement two of RWE’s large hydrogen projects.</p><p style="margin-left:0px;text-align:start;">The funds will be provided for the construction of a 300-MW electrolyser to generate green hydrogen in Lingen (Lower Saxony) as part of the GET H2 Nukleus project as well as a hydrogen facility in Gronau-Epe (North Rhine-Westphalia).</p><p style="margin-left:0px;text-align:start;">A third strand of funding has been granted to a consortium developing a 100-MW electrolyser plant at the port of Rostock (Mecklenburg-Western Pomerania) as part of the HyTechHafen Rostock project. RWE is a member of this consortium.</p><p style="margin-left:0px;text-align:start;">The federal government is providing 70% of the total funding for each of the projects. The states of Lower Saxony, North Rhine-Westphalia, and Mecklenburg-Western Pomerania are contributing 30% to the venture on their respective territories. RWE is planning to invest a medium three-digit million-euro amount in the three projects.</p><p style="margin-left:0px;text-align:start;"><strong>Markus Krebber, CEO of RWE AG:</strong><span><strong>&nbsp;</strong></span>“Today is a great day for the ramp-up of the hydrogen economy. Thanks to the funding from the German government and the federal state governments, the first industrial-scale hydrogen projects in Germany can now be implemented. Green electricity and hydrogen will be crucial in terms of making locations attractive to industry. It is thus vital to also invest in electrolysers producing hydrogen in Germany and the associated infrastructure including storage facilities without delay. Our Team RWE has worked tirelessly to drive our hydrogen projects forward – it is great to see that they are getting off the ground now.”</p><p style="margin-left:0px;text-align:start;">The EU Commission recognised the projects as Important Projects of Common European Interest (IPCEI) in February, together with other hydrogen schemes. This made it possible for national bodies to grant funding.</p><p style="margin-left:0px;text-align:start;">Germany’s Minister for Economic Affairs and Climate Action and representatives from the federal states presented the funding notifications in Berlin on Monday.</p><p style="margin-left:0px;text-align:start;">The Lingen site plays a key part in RWE’s hydrogen strategy. There, the company wants to install hydrogen generating capacities of 300 megawatts in 100-megawatt increments by 2027 as part of the GET H2 Nukleus project. The first 100-MW electrolyser is to be commissioned in 2025. Green hydrogen produced in Lingen will help industrial companies to significantly reduce their carbon emissions.</p><p style="margin-left:0px;text-align:start;">Transport and storage infrastructure will play a crucial role in the ramp-up of the hydrogen economy. Two caverns will be used for storing hydrogen in RWE Gas Storage West’s planned facility in Gronau-Epe. The storage plant is aimed at balancing out the fluctuations in hydrogen generation using wind and solar energy. In this way hydrogen can be supplied to industrial customers as required by the companies. The first hydrogen is to be stored at the facility in 2026.</p><p style="margin-left:0px;text-align:start;">A 100-MW electrolyser will be constructed at Rostock port as part of the HyTechHafen Rostock project and will produce green hydrogen from 2027. Some of the hydrogen is intended to supply local consumers, the rest to be fed into the Germany-wide hydrogen core grid that is currently being developed. The operating company is a joint venture of ROSTOCK PORT GmbH, RheinEnergie AG, EnBW Neue Energien AG, and RWE Generation SE.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Mon, 15 Jul 2024 14:00:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/3d4f39d4-2f8c-4b9f-9c4d-830aa7fd3971/500_2024-07-15-wasserstoff-grossprojekte-von-rwe-erhalten-foerderzusagen-von-bund-und-laendern.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/3d4f39d4-2f8c-4b9f-9c4d-830aa7fd3971/500_2024-07-15-wasserstoff-grossprojekte-von-rwe-erhalten-foerderzusagen-von-bund-und-laendern.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/3d4f39d4-2f8c-4b9f-9c4d-830aa7fd3971/2024-07-15-wasserstoff-grossprojekte-von-rwe-erhalten-foerderzusagen-von-bund-und-laendern.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[2024-07-15-wasserstoff-grossprojekte-von-rwe-erhalten-foerderzusagen-von-bund-und-laendern]]></pp:imageTitle></item><item>
                        <title>RWE invites you to the dialogue market on 4th June in Gronau</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-invites-you-to-the-dialogue-market-on-04-june-in-gronau/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-invites-you-to-the-dialogue-market-on-04-june-in-gronau/</guid><pp:caseid>634329</pp:caseid><pp:subtitle>Third dialogue market to present the construction activities for the first hydrogen storage facility</pp:subtitle><description><![CDATA[<p>RWE Gas Storage West will present the construction activities for a hydrogen cavern storage facility in Gronau at a public information event on 4 June. All interested citizens and representatives of local authorities and the press are cordially invited to the event.</p><p style="margin-left:0cm;"><span style="background-color:white;"><strong>RWE dialogue market on June 4th &nbsp;2024&nbsp;</strong></span></p><p style="margin-left:0cm;"><span style="background-color:white;"><strong>Place: RWE Kavernenspeicher L-Gas, Kottiger Hook 63, 48599 Gronau-Epe&nbsp;</strong></span></p><p style="margin-left:0cm;"><span style="background-color:white;"><strong>Duration: 15:00 to 19:00&nbsp;</strong></span></p><p>Participation in the dialogue market is only possible after prior registration by 02.06.2024 at the latest. Registrations are possible via the contact form for this event on the project homepage named below.</p><p>At the information event, experts from RWE will be available for personal discussions and will present the project in detail.</p><p>Information on the project can also be found on the<span style="background-color:white;"> </span><a href="https://www.rwe-gasstorage-west.com/wasserstoff/" target="_blank"><span style="background-color:white;">projekt homepage</span></a><span style="background-color:white;"> .</span></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Wed, 29 May 2024 08:11:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/48e48ec0-c279-49e8-99d0-2f61225b4c91/500_rwe-gas-storage-west-h2-speicher.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/48e48ec0-c279-49e8-99d0-2f61225b4c91/500_rwe-gas-storage-west-h2-speicher.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/48e48ec0-c279-49e8-99d0-2f61225b4c91/rwe-gas-storage-west-h2-speicher.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[RWE_Gas_Storage_West_H2-Speicher]]></pp:imageTitle></item><item>
                        <title>Storage demand enquiry for hydrogen</title>
                        <link>https://news.rwe-gasstorage-west.com/storage-demand-enquiry-for-hydrogen/</link>
                        <guid>https://news.rwe-gasstorage-west.com/storage-demand-enquiry-for-hydrogen/</guid><pp:caseid>632321</pp:caseid><description><![CDATA[<p style="margin-left:0px;text-align:justify;"><span style="background-color:rgb(255,255,255);"><span style="padding:0px;">RWE Gas Storage West has launched today </span><span style="margin:0px;padding:0px;text-align:justify;">an initial market survey. Hydrogen producers as well as industrial users and traders are welcome to register their future storage demand for hydrogen until the end of June 2024.</span></span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">As a clean, storable and transportable energ</span><span style="background-color:transparent;"><span style="margin:0px;padding:0px;">y source, hydrogen is an important link in the energy transition. Hydrogen storages play a cen</span></span><span style="margin:0px;padding:0px;">tral role in balancing out fluctuations in renewable energy production and is the basis for providing consumers with structured supply products.&nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">RWE Gas Storage West has launched a non-binding market enquiry in order to design hydrogen storage facilities to meet the needs of the future hydrogen market. For further investment planning, &nbsp;it is important to determine when and where demand for hydrogen storage capacities will arise. The results of the market survey will be used to develop customised storage capacities.&nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;"><strong>Interested parties are invited to submit their storage demand </strong></span><a href="https://www.rwe-gasstorage-west.com/en/hydrogen/market-survey-hydrogen-storage-requirements/" target="_blank"><span style="margin:0px;padding:0px;"><strong>here</strong></span></a><span style="margin:0px;padding:0px;"><strong>.</strong></span></p><p style="margin-left:0px;"><span style="background-color:rgb(255,255,255);"><span style="margin:0px;padding:0px;text-align:left;">RWE Gas Storage West is developing the first industrial-scale hydrogen storage facility in Gronau - Epe (North Rhine-Westphalia). RWE has applied for funding for the construction of this storage facility as part of the "IPCEI Hydrogen" (Important Projects of Common European Interest) programme. The EU has approved federal and state funding for the project. A </span></span><span style="background-color:transparent;"><span style="margin:0px;padding:0px;text-align:left;">firm </span></span><span style="background-color:rgb(255,255,255);"><span style="margin:0px;padding:0px;text-align:left;">funding commitment is still pending. RWE intends to take the investment decision as soon as a </span></span><span dir="ltr">granting commitment has been received</span><span style="background-color:rgb(255,255,255);"><span style="margin:0px;padding:0px;text-align:left;">.&nbsp;</span></span></p><p>&nbsp;</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Tue, 21 May 2024 17:00:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/virtual-rwe-background-h2.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Virtual_RWE_Background_H2]]></pp:imageTitle></item><item>
                        <title>RWE Gas Storage West has received the planning approval</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-gas-storage-west-has-received-the-planning-approval/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-gas-storage-west-has-received-the-planning-approval/</guid><pp:caseid>618895</pp:caseid><pp:subtitle>Hydrogen storage in Gronau-Epe</pp:subtitle><description><![CDATA[<p>RWE Gas Storage West has received the planning approval for the expansion of the gas storage site in Gronau-Epe to include additional plant components for hydrogen storage. The Arnsberg district government will publish this decision from January 29, 2024.</p><p>The approval process started in April 2022. RWE submitted the framework operating plan for approval in February 2023. The planning approval procedure included an environmental impact assessment and public participation. Parallel to the approval process, RWE presented the project to the neighborhood, political representatives and the general public at several events.</p><p>Germany's first commercially used hydrogen cavern storage facility is to be built largely on the existing premises of RWE Gas Storage West GmbH at Kottiger Hook by the end of 2026. The preparatory construction measures will start soon in order to meet the tight schedule for the project. The relevant planning documents have already been submitted to the Arnsberg district government.</p><p>RWE would like to use two caverns in Gronau to store approx. 66 million cubic meters of hydrogen. For this purpose, a cavern still under brine and a cavern currently used as a natural gas storage facility are to be converted and supplemented with the necessary above-ground operating facilities and connections. The storage facility is an important part of the infrastructure required for the ramp-up of the hydrogen economy.</p><p><br>RWE has applied for funding for the construction of the storage facility as part of the "IPCEI Hydrogen" (Important Projects of Common European Interest). Funding approval is still pending. The final investment decision can therefore not yet be made by RWE. The Federal Ministry of Economics and Climate Protection and the state of North Rhine-Westphalia have already selected projects for which funding will be made available in the event of a positive decision at European level. RWE's hydrogen storage facility is on this list and has already received approval for an early start to the project.</p><p><br>More information on the hydrogen project in Gronau can be found on the <a href="https://www.rwe-gasstorage-west.com/wasserstoff/"><span>projekt-homepage</span></a><span>.</span></p><p>&nbsp;</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Fri, 26 Jan 2024 15:00:00 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/virtual-rwe-background-h2.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Virtual_RWE_Background_H2]]></pp:imageTitle></item><item>
                        <title>Newly founded European Alliance &quot;H2eart for Europe&quot;</title>
                        <link>https://news.rwe-gasstorage-west.com/newly-founded-european-alliance-h2eart-for-europe/</link>
                        <guid>https://news.rwe-gasstorage-west.com/newly-founded-european-alliance-h2eart-for-europe/</guid><pp:caseid>618574</pp:caseid><description><![CDATA[<p>RWE Gas Storage West GmbH is founding members of H2eart for Europe.</p><p>H2eart for Europe is an EU-wide, CEO-led alliance committed to accelerating the decarbonisation of the European energy system at the lowest cost to society by scaling up the deployment of underground hydrogen storage (UHS). Launched in Brussels on 23rd of January 2024, the alliance aims to provide fact-based reports and analysis that can serve policymakers as guidance, and that utilise and build on the experience of our members, leading companies paving the future of hydrogen storage across Europe. The members of H2eart for Europe are committed to invest in scaling up UHS infrastructure to meet the flexibility demand in a decarbonised energy system.</p><p>Detailed information on the alliance work are published <a href="https://h2eart.eu/" target="_blank">here</a></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Fri, 26 Jan 2024 13:07:09 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/4d861bd4-6bce-4571-8daf-317253912b87/500_p062857-317028.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/4d861bd4-6bce-4571-8daf-317253912b87/500_p062857-317028.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/4d861bd4-6bce-4571-8daf-317253912b87/p062857-317028.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[P062857-317028]]></pp:imageTitle></item><item>
                        <title>GTC consultation 2023</title>
                        <link>https://news.rwe-gasstorage-west.com/gtc-consultation-2023/</link>
                        <guid>https://news.rwe-gasstorage-west.com/gtc-consultation-2023/</guid><pp:caseid>612840</pp:caseid><description><![CDATA[<p style="margin-left:0px;text-align:left;">RWE Gas Storage West GmbH (as follows RGSW) consults all storage customers for its „General Terms and Conditions for access to the natural gas storage facilities operated by RGSW“ (GTC) according to § 28 para. 3 EnWG.&nbsp;</p><p style="margin-left:0px;text-align:left;">The consultation is based on the actual version attached in the download area. &nbsp;All market parties are invited to send in their comments with regard to the GTC.</p><p style="margin-left:0px;text-align:left;">Please send us your comments in writing by 30st December&nbsp;2023.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Mon, 04 Dec 2023 15:14:00 +0100</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1884.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/clients/150_1884.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1884.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Invitation to the dialogue market on 28 March in Gronau</title>
                        <link>https://news.rwe-gasstorage-west.com/invitation-to-the-dialogue-market-on-28-march-in-gronau/</link>
                        <guid>https://news.rwe-gasstorage-west.com/invitation-to-the-dialogue-market-on-28-march-in-gronau/</guid><pp:caseid>565453</pp:caseid><description><![CDATA[<p><span>On March 28, RWE Gas Storage West will present its updated plans for a hydrogen cavern storage in Gronau at a public information event based on the planning approval documents that have been submitted.&nbsp;</span></p><p><span>All interested citizens as well as representatives of municipalities and the press are cordially invited to the dialogue market:</span></p><p><strong>RWE Dialogmarkt 28th March 2023&nbsp;</strong><br><strong>Place: „Hotel Schepers“, Ahauser Str. 1, 48599 Gronau-Epe&nbsp;</strong><br><strong>Time: 3:00 p.m. until 7:00 p.m. &nbsp;</strong><br>&nbsp;</p><p><span>At the information event, experts from RWE and partners will be available for personal discussions and will present the project in detail.</span></p><p><br><span>Information about the project can also be found on the project homepage &nbsp;</span><a href="https://www.rwe-gasstorage-west.com/en/hydrogen/">Hydrogen (rwe-gasstorage-west.com)</a></p><ul><li>Second dialogue market to present the concrete planning for the first hydrogen storage facility</li><li>All interested citizens are cordially invited</li></ul>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Thu, 23 Mar 2023 16:24:45 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/63c6e369-6fd8-4655-bb70-b131fc3bf1e2/500_20230217darstellungbetriebsgelaumlndewasserstoffspeicher-ohnebeschriftung.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1884/63c6e369-6fd8-4655-bb70-b131fc3bf1e2/500_20230217darstellungbetriebsgelaumlndewasserstoffspeicher-ohnebeschriftung.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/63c6e369-6fd8-4655-bb70-b131fc3bf1e2/20230217darstellungbetriebsgelaumlndewasserstoffspeicher-ohnebeschriftung.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[20230217; Darstellung Betriebsgel&amp;auml;nde Wasserstoffspeicher_ohne Beschriftung]]></pp:imageTitle></item><item>
                        <title>RWE submits planning approval documents</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-submits-planning-approval-documents/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-submits-planning-approval-documents/</guid><pp:caseid>559967</pp:caseid><pp:subtitle>hydrogen storage in Epe, Gronau</pp:subtitle><description><![CDATA[<ul><li>General operating plan submitted to Arnsberg District Government</li><li>Approval procedure includes environmental impact assessment</li><li>RWE will continue public involvement on 28 March with a dialogue market  at Hotel Schepers in Gronau</li></ul><p><span>This week, RWE Gas Storage West submitted planning approval documents to Arnsberg District Government for the construction of a hydrogen storage facility in Epe, Gronau by way of an amendment to the existing general operating plan. Once it has received and reviewed the approval documentation, Arnsberg District Government will promptly publish the application documents. RWE announced the start of the approval procedure back in April 2022 and subsequently presented the project to local residents, policy-makers and the general public at a number of meetings.&nbsp;</span></p><p><span>An informational “dialogue market”&nbsp;related to the submission of the planning approval documents will take place on 28 March. RWE will use this opportunity to outline the detailed plans of the project to all interested parties. This event will be held at Hotel Schepers in Epe, Gronau.</span>&nbsp;<span> &nbsp;</span></p><p><span>German’s first hydrogen cavern storage facility to be used for commercial purposes will mostly be built on RWE’s existing site at Kottiger Hook by the end of 2026. In October last year RWE announced that, in contrast to the original plan, it would add another cavern to the planned facilities, bringing the total to two caverns. The second cavern is located within the defined assessment area for the environmental impact assessment. This is part of the ongoing approval procedure.</span></p><p><span>As RWE Gas Storage West aims to provide information as comprehensively and transparently as possible, the company has decided to involve the public at an early stage and on an ongoing basis. Interested members of the public can learn more about the planned project on the company’s project homepage (</span><a href="https://www.rwe-gasstorage-west.com/en/hydrogen/"><span>www.rwe-gasstorage-west.com/en/hydrogen/</span></a><span>).</span></p><p><span>RWE has applied for funding for the construction of the storage facility within the framework of IPCEI (Important Projects of Common European Interest) Hydrogen. Funding has not yet been approved, which means that RWE’s final investment decision is still pending. The Federal Ministry of Economics and Climate Protection and the state of North Rhine-Westphalia have selected projects—including RWE’s hydrogen storage facility—that will receive national funding if a favourable decision is made at the European level.&nbsp;</span></p><p>&nbsp;</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Tue, 21 Feb 2023 07:43:47 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/48e48ec0-c279-49e8-99d0-2f61225b4c91/500_rwe-gas-storage-west-h2-speicher.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/48e48ec0-c279-49e8-99d0-2f61225b4c91/500_rwe-gas-storage-west-h2-speicher.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/48e48ec0-c279-49e8-99d0-2f61225b4c91/rwe-gas-storage-west-h2-speicher.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[RWE_Gas_Storage_West_H2-Speicher]]></pp:imageTitle></item><item>
                        <title>RGSW consults the General Terms and Conditions</title>
                        <link>https://news.rwe-gasstorage-west.com/rgsw-consults-the-general-terms-and-conditions/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rgsw-consults-the-general-terms-and-conditions/</guid><pp:caseid>551582</pp:caseid><description><![CDATA[<p style="margin-left:0px;text-align:left;">RWE Gas Storage West GmbH (as follows RGSW) consults all storage customers for its „General Terms and Conditions for access to the natural gas storage facilities operated by RGSW“ (GTC) according to § 28 para. 3 EnWG.&nbsp;</p><p style="margin-left:0px;text-align:left;">The consultation is based on the actual version attached in the download area. &nbsp;All market parties are invited to send in their comments with regard to the GTC.</p><p style="margin-left:0px;text-align:left;">Please send us your comments in writing by 30st December&nbsp;2022.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Fri, 09 Dec 2022 15:00:00 +0100</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1884.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/clients/150_1884.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1884.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Updated GTC Annex Credit Screening</title>
                        <link>https://news.rwe-gasstorage-west.com/updated-gtc-annex-credit-screening/</link>
                        <guid>https://news.rwe-gasstorage-west.com/updated-gtc-annex-credit-screening/</guid><pp:caseid>535206</pp:caseid><description><![CDATA[<p>As of 1st October 2022 RWE Gas Storage West updated the GTC annex Credit Screening.</p><p>The document is available for download in the <a href="https://www.rwe-gasstorage-west.com/en/download-area" target="_blank">download area </a>.</p><p>In case of questions the sales team is happy to help.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Sat, 01 Oct 2022 10:00:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_file0001817248786.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_file0001817248786.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/file0001817248786.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[file0001817248786.jpg]]></pp:imageTitle></item><item>
                        <title>Invitation to the Dialogue Market on 9 June in Gronau</title>
                        <link>https://news.rwe-gasstorage-west.com/invitation-to-the-dialogue-market-on-9-june-in-gronau/</link>
                        <guid>https://news.rwe-gasstorage-west.com/invitation-to-the-dialogue-market-on-9-june-in-gronau/</guid><pp:caseid>512966</pp:caseid><description><![CDATA[<ul><li><strong>Planning for &nbsp;the first commercially used hydrogen storage facility will be presented</strong></li><li><strong>All interested citizens are invited</strong></li></ul><p>&nbsp;</p><p>RWE Gas Storage West is presenting its plans for a hydrogen storage &nbsp;in Gronau at a public information event on 9 June.&nbsp;&nbsp;<br>All interested members of the public, representatives of local authorities and the press are invited to the&nbsp;&nbsp;<br>dialogue market:<br><br><strong>RWE dialog markte on 9 June 2022&nbsp;</strong><br><strong>Place: „Alte Tenne“, Sunderhook 3, 48599 Gronau-Epe&nbsp;</strong><br><strong>Time: 15:00 bis 19:00 Uhr&nbsp;</strong></p><p><br>At the information event, experts from RWE as well as from partners will be available for personal discussions and will present the project in detail.&nbsp;&nbsp;<br>Information on the project can also be found on the project <a href="https://www.rwe-gasstorage-west.com/en/hydrogen/?" target="_blank">homepage</a>&nbsp;&nbsp;</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Tue, 07 Jun 2022 10:00:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/clients/150_1884.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/clients/150_1884.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/clients/150_1884.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[logo]]></pp:imageTitle></item><item>
                        <title>Approval procedure started for construction of hydrogen storage facility in Gronau</title>
                        <link>https://news.rwe-gasstorage-west.com/approval-procedure-started-for-construction-of-hydrogen-storage-facility-in-gronau/</link>
                        <guid>https://news.rwe-gasstorage-west.com/approval-procedure-started-for-construction-of-hydrogen-storage-facility-in-gronau/</guid><pp:caseid>504085</pp:caseid><description><![CDATA[<ul><li>Planning notice submitted to district government in Arnsberg</li><li>RWE to inform public about project transparently</li></ul><p><span>RWE Gas Storage West is contributing towards ramping up the European hydrogen economy as part of the GET H2 initiative. In this context, a new section for hydrogen is to be constructed at the natural gas cavern storage facilities at Kottiger Hook by 2026. Most of Germany's first commercial hydrogen cavern storage facility is to be built on the existing RWE site.</span></p><p><span>Yesterday, RWE submitted the required planning notice to the district government in Arnsberg, formally starting approval proceedings. Part of the general operating planning procedure under German mining law will be a voluntary environmental impact assessment with the participation of authorities, public interest groups and the public.</span></p><p><span>“Informing local residents and the public about the planned project in a transparent manner is important to us,” emphasises Andreas Frohwein, Technical Managing Director of&nbsp;</span><br><span>RWE Gas Storage West. RWE will hold a number of information events in connection with the project and its progress. People living in the vicinity of the storage facility were already invited to an event and another, in the form of a dialogue exchange in Gronau-Epe, is planned for&nbsp;</span><br><span>9 June 2022; venue and time are yet to be communicated by RWE. Anyone interested in the plans can find out more details on the (german) company's project website (</span><a href="http://www.rwe-gasstorage-west.com/wasserstoff"><span>www.rwe-gasstorage-west.com/wasserstoff</span></a><span>).</span></p><p><span>RWE has applied for funding under the IPCEI (Important Projects of Common European Interest) in the hydrogen sector scheme. IPCEI hydrogen is intended to drive the energy transition and in particular decarbonisation forward across Europe by developing technologies for utilising green hydrogen at an industrial scale.</span></p><p><span>The German Federal Ministry of Economic Affairs and Climate Action and the state government of North Rhine-Westphalia have already selected projects that will receive national funding if the initiative is given the green light at the European level; RWE’s hydrogen storage facility is on that list.</span></p><p><span>RWE is waiting with its final investment decision until funding commitment is confirmed. However, in order to be able to stick to the ambitious project schedule, RWE is already pushing ahead with the approval procedure and the planning process at its own risk. A decision on funding is expected later this year.&nbsp;</span></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Mon, 02 May 2022 08:00:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000" length="0" type="image/png" />
                <pp:image>https://content.presspage.com/uploads/1884/500_virtual-rwe-background-h2.png?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/virtual-rwe-background-h2.png?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Virtual_RWE_Background_H2]]></pp:imageTitle></item><item>
                        <title>Planning for hydrogen storage in Gronau underway</title>
                        <link>https://news.rwe-gasstorage-west.com/planning-for-hydrogen-storage-in-gronau-underway/</link>
                        <guid>https://news.rwe-gasstorage-west.com/planning-for-hydrogen-storage-in-gronau-underway/</guid><pp:caseid>496932</pp:caseid><description><![CDATA[<ul><li>Investment decision dependent on IPCEI funding commitment</li><li>Approval procedure with public participation to start in first half of 2022</li></ul><p style="text-align:start;">As part of the GET H2 initiative, RWE Gas Storage West intends to build a hydrogen storage facility in Gronau-Epe by 2027. Storage facilities are also an important part of a future European infrastructure for green hydrogen.</p><p style="text-align:start;">Most of the facility is to be built on the RWE site at Kottiger Hook. The connection of the cavern to the above-ground facility as well as connection to a future hydrogen transport network will be made through pipelines outside the storage site.&nbsp;</p><p style="text-align:start;">Together with partners from the GET H2 initiative, RWE has applied for funding through the "Important Projects of Common European Interest" (IPCEI) programme. The decision is expected in the second half of 2022. The final investment decision depends on a corresponding funding commitment. In order to be able to ensure commercial commissioning by 2027, the formal approval process with public participation is to start in the first half of 2022.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Fri, 04 Mar 2022 13:40:00 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_epe-img-5158a.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_epe-img-5158a.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/epe-img-5158a.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Epe 5158a]]></pp:imageTitle></item><item>
                        <title>RGSW consults its &quot;General Terms and Conditions&quot;</title>
                        <link>https://news.rwe-gasstorage-west.com/rgsw-consults-its-general-terms-and-conditions/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rgsw-consults-its-general-terms-and-conditions/</guid><pp:caseid>486636</pp:caseid><description><![CDATA[<p>RWE Gas Storage West GmbH (as follows RGSW) consults all storage customers for its &bdquo;General Terms and Conditions for access to the natural gas storage facilities operated by RGSW&ldquo; (GTC) according to &sect; 28 para. 3 EnWG.&nbsp;</p><p>The consultation is based on a draft version attached as download. The updated articles are marked with a grey background. All market parties ar invited to send in their comments with regard to the updated GTC.</p><p>Please send us your comments in writing by 21st January&nbsp;2022.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Fri, 17 Dec 2021 13:48:35 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_file0001817248786.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_file0001817248786.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/file0001817248786.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[file0001817248786.jpg]]></pp:imageTitle></item><item>
                        <title>Start of market area Trading Hub Europe (THE)</title>
                        <link>https://news.rwe-gasstorage-west.com/start-of-market-area-trading-hub-europe-the/</link>
                        <guid>https://news.rwe-gasstorage-west.com/start-of-market-area-trading-hub-europe-the/</guid><pp:caseid>475995</pp:caseid><description><![CDATA[<p>From 1 October 2021 Trading Hub Europe GmbH (THE)&nbsp;will operate the entire German market area consisting of the "old" market areas Net Connect Germany (NCG) and Gaspool.</p><p>With regard to that change of market area&nbsp;RWE Gas Storage West has addopted its General Terms and Conditions and the corresponding Technical Conditions.</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Fri, 01 Oct 2021 07:00:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_speicherepel09.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_speicherepel09.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/speicherepel09.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Speicher Epe L 09]]></pp:imageTitle></item><item>
                        <title>GET H2: New alliance aims to create the basis of a European infrastructure for green hydrogen</title>
                        <link>https://news.rwe-gasstorage-west.com/get-h2-new-alliance-aims-to-create-the-basis-of-a-european-infrastructure-for-green-hydrogen/</link>
                        <guid>https://news.rwe-gasstorage-west.com/get-h2-new-alliance-aims-to-create-the-basis-of-a-european-infrastructure-for-green-hydrogen/</guid><pp:caseid>439729</pp:caseid><pp:subtitle>RWE Gas Storage West</pp:subtitle><description><![CDATA[<ul><li><strong>Consortium of seven companies to launch hydrogen economy with production, transport, storage and industrial offtake of climate-friendly green hydrogen from renewable energies in 2024</strong></li><li><strong>Bundled projects could avoid up to 16 million tonnes of CO2 by 2030</strong></li><li><strong>Public funding sought through "Important Projects of Common European Interest" (IPCEI) programme</strong></li><li><strong>Regulatory changes before the end of this legislative period are crucial for a timely entry into the hydrogen economy.</strong><br />&nbsp;</li></ul><p><strong>Bochum/Dortmund/Essen/Marl/M&uuml;nster/Salzgitter, 9 March 2021</strong></p><p>Seven companies from the GET H2 initiative show how rapidly the planning of the national and European hydrogen economy is developing. The consortium wants to build a cross-border infrastructure for hydrogen - from the production of green hydrogen to transport and industrial use. From Lingen (Emsland) to Gelsenkirchen and from the Dutch border to Salzgitter, production, transport, storage and industrial acceptance of green hydrogen are to be connected in several steps between 2024 and 2030 under the umbrella of the overall project.</p><p>For this project, the companies bp, Evonik, Nowega, OGE, RWE, Salzgitter Flachstahl and Thyssengas, all partners in the GET H2 hydrogen initiative, have now submitted an expression of interest for funding under the IPCEI programme (Important Project of Common European Interest) to the Federal Ministry of Economics and Technology. By using green hydrogen in refineries, in steel production and for other industrial uses, the overall project outlined here should be able to avoid CO2 emissions of up to 16 million tonnes by 2030.</p><p><strong>The project at a glance:</strong><br /><span>In Lingen (Emsland) RWE produces green hydrogen via an electrolysis plant. From 2024 this will be used to supply the bp refinery in Gelsenkirchen. Most of the transport will take place via existing gas grid lines (shown in orange), which will be converted to hydrogen transport. In 2025, it is planned to extend the network to the Dutch border, and in 2026 RWE will integrate a cavern storage facility in Gronau-Epe. By 2030, the network is to be extended to the Salzgitter steelworks and, if necessary, connected to other networks (shown in light blue).</span></p><p><span>Collectively, the overall project can map the essential building blocks of the green hydrogen value chain and form the basis for an efficient European gas infrastructure for hydrogen. With the integration of a cavern storage facility by RWE in Gronau-Epe, the system, which is based on electricity generation from wind energy, can also make a contribution to supply security. The link to the Dutch gas market lays the foundation for a trans-European hydrogen market. The expansion of the project by partners from the transport sector and for the distribution of green hydrogen in the area is also already in preparation. Other partners from the GET H2 initiative have also submitted expressions of interest for IPCEI funding for projects aimed at building a hydrogen infrastructure.</span></p><p><span>The companies want to push ahead with the development of a hydrogen economy. However, these plans can only be implemented with the necessary regulatory framework. The current focus is on the amendment of the Energy Industry Act (EnWG). The companies are convinced that the draft passed by the Federal Cabinet at the beginning of February does not go far enough. It does not provide for an overarching regulation of gas and hydrogen networks with a uniform gas and hydrogen network fee. However, this would be the best solution to enable a uniform and non-discriminatory use of the hydrogen infrastructure at sustainable conditions. The IPCEI programme can finance the network construction in part. However, the financing of network operation requires a long-term solution to the charging issue in the EnWG.</span></p><p><span>Further political steps are also necessary to create incentives for the use of green hydrogen in industry. The national implementation of the EU Renewable Energy Directive 2 (RED 2), which was approved by the federal cabinet at the end of December, is an important step towards making the rapid use of green hydrogen economically viable for refineries through corresponding demand in the transport sector. The definition of the electricity purchase criteria is still outstanding here. The criteria for the levy exemption of green electricity used in electrolysis, which was decided in December as part of the amendment to the Renewable Energy Sources Act, also still need to be worked out. For the steel industry, a different subsidy path is necessary, as RED 2 does not apply here. Corresponding support models such as so-called Carbon Contracts for Difference (CCfD), which favour the use of CO2-free or low-CO2 steel, have been announced in the German government's hydrogen strategy, but legal implementation is still pending.</span></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Tue, 09 Mar 2021 14:00:00 +0100</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_infographic.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_infographic.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/infographic.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Infographic]]></pp:imageTitle></item><item>
                        <title>RWE researches large-scale storage for green electricity in salt caverns</title>
                        <link>https://news.rwe-gasstorage-west.com/rwe-researches-large-scale-storage-for-green-electricity-in-salt-caverns/</link>
                        <guid>https://news.rwe-gasstorage-west.com/rwe-researches-large-scale-storage-for-green-electricity-in-salt-caverns/</guid><pp:caseid>416510</pp:caseid><pp:subtitle>Organic flow technology will enable underground gas storage systems to serve as large batteries in the future</pp:subtitle><description><![CDATA[<p><span><span><span><span><span>RWE Gas Storage West GmbH and CMBlu Energy AG have initiated a collaborative project to investigate how RWE can utilise the salt caverns currently used for gas storage as large-scale, organic flow batteries. These underground caverns could potentially store capacities of up to several gigawatt hours of electricity from renewable sources. By comparison, Europe&rsquo;s largest battery at present &ndash; based on lithium-ion technology &ndash; is located in Jardelund, Schleswig-Holstein, and has a storage capacity of about 50 megawatt hours.</span></span></span></span></span></p>

<p><span><span><span><span><span><span><span><span>&ldquo;The future belongs to renewables. In order to make optimal use of green electricity, we need large stationary electricity storage systems. At RWE, we are exploring different storage solutions&rdquo;, comments Andreas Frohwein, Technical Managing Director of RWE Gas Storage West. &ldquo;In the future, we may be able to use our salt caverns as batteries for storing enormous quantities of electricity. Using existing technical infrastructure, they could also be connected to the electricity grid quickly.&rdquo;</span></span></span></span> </span></span></span></span></p>

<p><span><span><span><span><span><span><span><span>Peter Geigle, CEO of CMBlu Energy AG, also perceives major potential: &ldquo;Organic flow batteries are based on carbon, which is available globally in almost unlimited volumes. The components are easy to recycle, and water is the largest component by volume. That means the battery isn&rsquo;t flammable, so it&rsquo;s safe to use. In addition, organic storage systems use no metal, unlike most other batteries.&rdquo;</span></span></span></span> </span></span></span></span></p>

<p><span><span><span><b><span><span>Planned installation of a test system by 2024</span></span></b></span></span></span></p>

<p><span><span><span><span><span>To be able to use the salt caverns as batteries in the future, RWE and CMBlu are planning to fill them with an organic electrolyte solution, which will then serve as the primary energy source. As a first step, potentially suitable electrolytes have been identified as part of a theoretical feasibility study. In the second stage, between now and the beginning of 2021, their suitability for use in salt caverns will be investigated in the lab.</span></span></span></span></span></p>

<p><span><span><span><span><span>From the spring of 2021, once a suitable electrolyte has been identified, work will start on constructing and operating a test system. The planned generating capacity of that system is 100 kilowatts, with a storage capacity of up to 1,000 kilowatt hours. This third stage of the project is expected to be concluded by the spring of 2024.</span></span></span></span></span></p><p><span><span><span><b><i><span><span><span><span>RWE Gas Storage West GmbH</span></span></span></span></i></b></span></span></span></p><p><span><span><span><i><span><span><span><span>Essen-based RWE Gas Storage West operates and markets five underground natural gas storage facilities (cavern storage systems) for the north-west European gas market with a working gas volume of about 1.7 billion cubic metres. These natural gas storage facilities, combined with the flexible and reliable services of RWE Gas Storage West, make an important contribution to security of supply in the natural gas market. Looking into the future, the gas storage facilities with their ability to store energy for the short and long term in the context of integrated energy can play an important part in ensuring a reliable and affordable energy transition. The large-scale electricity storage facility based on redox flow battery technology is a step in this direction.</span></span></span></span></i></span></span></span></p><p><em><span><span><span><b><span><span><span><span>CMBlu Energy AG</span></span></span></span></b></span></span></span></em></p><p><em><span><span><span><span><span><span><span><span>CMBlu develops large-scale, hi-tech stationary electricity storage facilities for all areas of the energy system. With a staff of more than 60 at its Alzenau location, near Frankfurt am Main, it is a pioneer and market leader in sustainable organic flow batteries. It therefore delivers a flexible, scalable key technology for the energy transition. Working with leading industrial firms, it designs and produces high-performance batteries for national and international customers.</span></span></span></span></span></span></span></span></em></p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Wed, 30 Sep 2020 08:00:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_rwe-fluumlssigbatterie-20200925.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_rwe-fluumlssigbatterie-20200925.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/rwe-fluumlssigbatterie-20200925.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[RWE_Fl&amp;uuml;ssigbatterie_20200925]]></pp:imageTitle></item><item>
                        <title>Change of company name</title>
                        <link>https://news.rwe-gasstorage-west.com/change-of-company-name/</link>
                        <guid>https://news.rwe-gasstorage-west.com/change-of-company-name/</guid><pp:caseid>399885</pp:caseid><description><![CDATA[<p><span>Final step of one of the largest transactions in German industrial history: </span></p>

<p><span>1st July 2020, the major asset swap between RWE and E.ON is finally completed, as RWE takes over the innogy activities. As a result inter alia the gas storage activities are transferred to RWE and are now part of the "new RWE".</span></p>

<p><span>In this context as of July 16 i</span>nnogy Gas Storage NWE GmbH is renamed RWE Gas Storage West GmbH.</p>

<p>The business will go on and the known contact partners of our sales team will remain the same.</p>

<p><span><span>We look forward to a continued good cooperation with all of our customers.</span></span></p>

<p>&nbsp;</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Tue, 21 Jul 2020 09:16:33 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_img-3929.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_img-3929.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/img-3929.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[IMG_3929]]></pp:imageTitle></item><item>
                        <title>Storage Epe NL remains for storage year 2020 in the Netherlands</title>
                        <link>https://news.rwe-gasstorage-west.com/storage-epe-nl-remains-for-storage-year-2020-in-the-netherlands/</link>
                        <guid>https://news.rwe-gasstorage-west.com/storage-epe-nl-remains-for-storage-year-2020-in-the-netherlands/</guid><pp:caseid>385999</pp:caseid><description><![CDATA[<p><span>innogy Gas Storage NWE GmbH would like to inform that also in storage year 2020 the storage Epe NL will be operated and marketed into the Netherlands via the connection to the G-gas grid of Gasunie Transport Services B.V..</span></p>

<p>&nbsp;</p>]]></description><category><![CDATA[dialog]]></category>
            <pubDate>Wed, 08 Apr 2020 11:25:00 +0200</pubDate>
            <enclosure url="https://content.presspage.com/uploads/1884/500_speicherepel21.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/1884/500_speicherepel21.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/1884/speicherepel21.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Speicher Epe L 21]]></pp:imageTitle></item></channel>
                    </rss>